See the light pouring in from the hole in the ceiling? |
The en suite will not have a bathtub because there is a big jetted tub in the main bathroom. Instead, MT has framed in what will be a nice oversize shower.
Future shower in the en suite |
Plumbing lines in the future shower |
MT has put up some of the drywall in the new bathroom.
When I left, he and T were going to put sheet rock up on the ceiling. That is really a two-man job. Before T came in to help MT with the sheet rock, he was out pulling weeds.
T works with his dad sometimes, and this week, he got a job at a sandwich shop in our neighborhood! He is working part time and has had two shifts so far. He seems to like it and is motivated to make some money. It's his first real job. My baby is growing up :)
I was just looking through these photos and it strikes me that work-in-progress photos aren't very fun. What will be fun is when the project is all done and we can compare what it used to look like to the finished rooms. It's really such a huge project and MT, along with some help from T, is doing it all himself. Blows my mind every time.
Have a great weekend, all!
1 comment:
That's a lot of work! Good job Marty!
I think T needs a hoe to weed no? :)
Post a Comment